New Vista Renovation
  • Home
  • About Us
  • Reviews
  • Blog
  • Contact Us

In Progress: Full Bathroom Remodel in East Sacramento

7/18/2019

1 Comment

 
In progress at our latest bathroom remodel... About to install some high quality shower doors and a few ordered items.
Picture
1 Comment

BEFORE Photos - At Our New Full Bathroom Remodel in East Sacramento

6/25/2019

2 Comments

 
Starting demo on a full bathroom remodel in East Sacramento! This one is going to be gorgeous. Keep posted! 
Picture
2 Comments

Double Bathroom Remodel

3/1/2019

1 Comment

 
This beautiful double bathroom remodel was for a nice young family out in Citrus Heights.
​
Included were: two vanity installs, floor tile, plus plumbing and electrical upgrades. The custom cabinetry was purchased from Cabinetry Connection in Sacramento.

New Vista had enlarged the shower both vertically and horizontally. We laid the tile with a cubby and shaving corner. It all came out perfect!
Picture
1 Comment

Full Bathroom Remodel in Sacramento!

1/4/2019

0 Comments

 
This remodel was for a nice young couple in the Sacramento area. They wanted a unique tile design in the shower stall - and it adds that bit of flair we love to see in our after photos! The new shower features new cubbies and a slim corner seat.
​
New Vista also installed their new vanity, plumbing, wall fixtures and flooring. 
Picture
0 Comments

*~*~ Master Bathroom Remodel in Roseville ~*~*

5/14/2018

46 Comments

 
This lovely remodel was a huge improvement to the previously small and outdated 80’s style bathroom! The wonderful middle school teacher, needed this relaxing bathroom haven to return home to, after work and an otherwise busy lifestyle. These are the final photos, from the in progress videos we’ve posted on recently.

We’ve changed the layout to the room, adding new space, by taking out the pocket door wall which had been in the way, then enlarging the shower by a couple feet. Also, that outdated carpet in the bathroom just had to go!

This high end 6’ Medallion Cabinetry brand vanity shown was custom built, just as desired, with tilt out trays added and in the Chai Latte color. Our customer selected a beautiful barn door which matched the modern farmhouse style she was after.

The new shower we installed had a shaving corner and cubbies framed in. The aged bronze finish frameless, pivoting shower door was the perfect match with the other metals in the room!

This remodel was a huge improvement to the previous space and proves that it’s possible to remodel rather than buy new for a beautiful home.

It only took roughly 4 weeks from the first building inspection to completion. Walking into this new master bathroom no longer had the frustrating feel it once had, and now feels more like stepping into a day spa! Thank you to our customers who allowed us to remodel this room for them! 
46 Comments

Passed Inspection At Our Bathroom Remodel!

4/20/2018

0 Comments

 
Moving on to the next phases, stay posted~!
0 Comments

In-Progress: At Our New 5-⭐️ Bathroom Remodel in Roseville

4/16/2018

0 Comments

 
0 Comments

Subway With Mosaic + Kohler Bathtub

2/13/2018

0 Comments

 
How do you all like the fresh new look in this bathroom? It had not been updated since the 1950's yellow tile was in fashion! High-quality Kohler steel bathtub+center piece glass mosaic+subway tile 
#lovekohler #freshstyle#newvistarenovation
​

New Vista Renovation
Office: (916) 621-3199
www.NewVistaRenovation.com
0 Comments

Shower Tile, Flooring and Vanity Installation Project:

12/15/2017

0 Comments

 
Our latest bathroom remodel! This one consists of a beautiful new vanity installation, light fixture, flooring, bathtub and tile shower installation!
​
If the owners are reading this post, congratulations on the new addition to your family! We hope that the new bathroom has livened up your home space for the little one!

Picture
Picture
Picture
0 Comments

Subway and Herringbone Tile Surround

11/20/2017

0 Comments

 
​Our customer had needed their master shower redone as a previous company had not addressed the dry rot under the tile when replacing recently. After a year, the shower had felt unsafe as the ground had been bowing.

Our team replaced extensive dry rot underneath this shower. Then we moved on to install a new finished product for the resolved shower:

The customer went with a white subway tile for the walls, with a stylish grayscale Herringbone pattern floor! We installed the Tile-Ready waterproofing system to prevent further leaks in this area. She is now able to shower in safety and live in style! 

Picture
Picture
0 Comments
<<Previous

    Author

    Sara 

    Categories

    All
    Bathroom Remodels
    Kitchen Remodels

    Archives

    December 2022
    July 2022
    May 2022
    October 2020
    September 2019
    July 2019
    June 2019
    May 2019
    April 2019
    March 2019
    February 2019
    January 2019
    December 2018
    October 2018
    June 2018
    May 2018
    April 2018
    March 2018
    February 2018
    January 2018
    December 2017
    November 2017
    October 2017
    August 2017
    July 2017
    March 2017
    February 2017
    January 2017
    October 2016
    September 2016
    April 2016
    March 2016
    December 2015

    RSS Feed

New Vista Renovation
Office: (916) 621-3199 - Fax: (916) 473-5797
​[email protected]
License # 888636
Serving Northern California
Copyright © 2020
  • Home
  • About Us
  • Reviews
  • Blog
  • Contact Us